9.3 Adding Flow Paths

Flow Paths are the logical connections between any two activities. There are different types flow paths depending on the activities that they connect (see Table 9-3, Different types of Flow Paths and its description).

To connect two activities with a flow path:

  1. Click the Activate the global connect tool icon in the palette.

  2. Click the activity from which you want the flow path to begin, then click the activity on which you want the flow path to end. The activities are connected.

  3. To configure the flow path, click the Activate the lasso tool icon in the palette, click the flow path, then select values for the required parameters in the SEQUENCE FLOW ACTIVITY window. For information about configuring flow paths, see Configuring Flow Paths.