IMS Option Technical Guide
Table of Contents
Index
Chapter 4: IMS Syncpoint Coordination
4.1 Overview
4.2 Terminology
4.3 Recoverable Resources
4.4 Syncpoint Coordinator
4.5 Commit and Backout
4.6 IMS Option Two-step Commit
4.6.1 Failure Reporting
4.6.2 Syncpoint Mixed Outcomes
4.6.3 Remote IMS Syncpoint Failures
4.7 Other Considerations
4.7.1 Message Queues
4.7.2 GSAM and Checkpoint/Restart
4.7.3 Fast Path
4.7.4 SETS and ROLS
4.7.5 Dynamic Database Attach