Synchronizing the Source Control Status of a Project

Under certain conditions, Silk Performer may fall out of sync with source control systems due to the corruption of linkage information. For example, if one were to close Silk Performer while Silk Performer is loaded with a checked out file and then check in that same file via the SCC, Silk Performer would not be aware that the file had been checked in.

Note: This function can be applied to complete projects only, not individual files.
  1. Choose one of the following:
    • In the Project menu tree, right-click the project node of a project that is under source control and select Synchronize.
    • Select File > Source Control > Synchronize .
  2. Click OK to confirm that you understand that all source control connection data for the project will be lost.